Resotainer

Digitising the customer journey, step by step, without disruption
At a glance (Challenges → Solution → Results)
- Challenge: simplify a cumbersome customer journey by allowing customers to save time at the branch by preparing their file online.
- Solution :
- E-commerce MVP on PrestaShop with KYC, SEPA mandate, advance payment and branch appointment booking.
- Continuous UX optimisation (batch redesigns + A/B testing) with Digilityx (UX) and 202 (technical, deployment, tracking).
Results: a streamlined semi-digital journey, a contract ready before the appointment, a reduction in time spent in-branch, and a Resotainer marketing team with enhanced skills. According to Digilityx, the redesigned pages saw a 30% increase in performance.

1. The starting point: an ‘appointment booking’ website only.
Before collaborating with 202, Resotainer offered a simple booking website:
customers chose a box online, but then had to:
- Go to the agency,
- Provide proof of identity,
- Sign a SEPA mandate,
- Sign a rental contract,
- Pay the first month’s rent.
The entire administrative and contractual process remained 100% physical.
2. Phase 1 — The MVP (2022 → May 2024): digitising the preparation of the file
202 e-commerce is developing an MVP under PrestaShop, partially transforming the customer journey:
- KYC: online identity verification with archiving of supporting documents.
- SEPA mandate: digital signature via a third-party provider, without bank blocking.
- Payment: online collection of the first month’s payment at the end of the process.
- Appointment booking: the customer chooses a slot online to visit the branch to sign and collect their keys.
The contract is still signed physically at the branch.
🟢 MVP impact: the customer arrives at the branch with a complete file. The appointment is quick, with no paperwork, and the contract is ready to sign. This is partial digitalisation, but it is smooth and measurable.

3. Phase 1.5 — Stabilisation (May 2024 → end of 2024)
After the MVP goes live (15 May 2024), 202 will support Resotainer with:
- Corrections based on initial user feedback,
- Technical enhancements (SEO, performance, bugs),
- Complete structuring of analytics tracking.
4. Phase 2 — Continuous optimisation (end of 2024 → Sept. 2025)
With a stable foundation, Resotainer, Digilityx and 202 are launching a performance-focused UX approach:
- Batch redesign with systematic A/B testing.
- Two pre-production environments for testing without impacting production.
- Tracking enriched with each iteration.
Optimised pages (examples):
- Agency page (MEP 12 May 2025)
- Product page (MEP 12 May 2025)
- Area pages (MEP 3 Sept. 2025)
- Home & Search (MEP 6 Oct. 2025)
Methodological principles:
- A/B testing → data-driven decision-making
- Dedicated pre-production → security
- Redesign batches → continuous improvement, without disruption
- Visual arbitration → progressive consistency
Benefits:
- SEO protected
- Smoothed costs
- Rapid deployment
- Measurable ROI

5. What remains to be digitised: a work in progress
Signing the contract and handing over the keys still require a visit to the branch.
Areas for development (phase 3) include:
- Full electronic signature (DocuSign or equivalent),
- Secure key box for a 100% autonomous process,
- Contract automation via CRM
However, these features are not yet in production. Their deployment will require testing, regulatory approval and on-the-ground support.
6. Learn, collaborate, adapt
This project illustrates 202’s ability to:
- Join an existing project team (Digilityx),
- Respect complementary areas of expertise,
- Industrialise a reliable, scalable and measurable MVP,
- Support a long-term data-driven UX redesign.
7. Why it is a genuine transformation (even if incomplete)
- ✅ Customer file prepared entirely online (ID → SEPA → payment)
- ✅ Time spent in the agency divided
- ✅ Transformed organisation (digital marketing team with enhanced skills)
- ✅ Continuous optimisation through A/B testing
- ❌ Route not yet 100% autonomous → V3 under consideration
8. Role of 202 e-commerce
Technical architect and production manager:
- Integration of KYC, SEPA and payment components
- Construction of the tunnel + choice of slot
- Implementation of tracking and pre-production system
- Successive deployments using a Dev+UX approach
9. Conclusion
A story of real transformation, step by step.
An MVP that streamlines, a team that progresses, a UX that performs, a project that continues to move forward.
Method: co-construction, measured MVP, A/B redesigns.
Result: improved performance without a big bang.
Next step: towards a 100% autonomous journey, already in preparation.